About the Complex
The Amge residential complex is being built in the central part of Kutaisi on Irakli Abashidze Avenue. The thirteen-story building combines monolithic frame construction technology with modern architectural solutions. The project includes underground and surface parking, a landscaped courtyard area, and elevator equipment. Construction work began in the first quarter of 2025, with completion scheduled for the fourth quarter of 2027. Apartments are handed over to buyers in a "white frame" condition, offering freedom for interior design.
Advantages
The complex stands out for its favorable location on Abashidze Avenue — one of the key thoroughfares of Kutaisi. Monolithic frame technology guarantees high seismic resistance and durability of the building. Residents get their own landscaped courtyard, a two-level parking system, and passenger elevators. The "white frame" condition allows adapting the layout and finishing to individual preferences. The combination of an affordable starting price and high-quality structural characteristics makes the project attractive for home purchases.
Location
The property is located in Kutaisi at 10g Irakli Abashidze Avenue. This avenue is one of the central city arteries, providing convenient connections to other districts. Nearby are administrative institutions, retail outlets, educational and medical organizations. The proximity to the Rioni River adds scenic appeal to the location. The district's infrastructure allows solving everyday tasks without long trips.
Surroundings
Within walking distance of the complex are grocery stores, pharmacies, cafes, and bank branches. Nearby are educational institutions and city parks for walks and recreation. Abashidze Avenue is full of retail and service outlets, saving residents from having to travel to remote districts. The area combines business activity with the measured pace characteristic of Kutaisi.
Transport
Irakli Abashidze Avenue provides excellent transport accessibility for the complex. City buses and minibuses run along the thoroughfare, connecting this area with all key points of Kutaisi. From here you can quickly reach the railway station and the central bus station of the city. The developed road network allows private vehicle owners to comfortably plan trips both within Kutaisi and towards Tbilisi and Batumi.
Complex Features
The thirteen-story building is being constructed using a monolithic frame scheme, ensuring reliability and freedom of layout solutions. The building has passenger elevators. The courtyard area is landscaped and designed for residents' recreation. Parking space is organized on two levels: underground and surface. The apartment mix offers a variety of layouts; final areas are to be confirmed. Finishing — "white frame": floor screed, utility routing, entrance doors and double-glazed windows installed.
Landscaping
The complex's inner courtyard is designed as a separate recreation area, sheltered from the city bustle. The adjacent territory features landscaping zones, pedestrian paths, and space for small architectural forms. The courtyard concept is focused on creating a comfortable environment for residents of all ages. The parking, located on underground and surface levels, solves the car storage problem, freeing the courtyard from vehicles.
Sales
Sales of apartments in the Amge complex are open. The starting price is from 50,350 US dollars. Construction work has been underway since the first quarter of 2025, with completion scheduled for the fourth quarter of 2027. Units are handed over to buyers in a "white frame" condition, which involves finishing work at the owner's discretion. Information about installment plans and mortgage programs is available from the developer or the sales department.
Developer
The project is being implemented by Amge Development Company. The developer controls the entire work cycle — from design to commissioning. The use of monolithic frame technology demonstrates a commitment to construction standards that ensure the durability and safety of the building. The complex is planned to be completed in the fourth quarter of 2027.